Testing is sometimes incorrectly thought as an after-the-fact activity; performed after programming is done for a product. Instead, testing should be performed at every development stage of the product. Test data sets must be derived and their correctness and consistency should be monitored throughout the development process.
If we divide the lifecycle of software development into “Requirements Analysis”, “Design”, “Programming/Construction” and “Operation and Maintenance”, then testing should accompany each of the above phases. If testing is isolated as a single phase late in the cycle, errors in the problem statement or design may incur exorbitant costs. Not only must the original error be corrected, but the entire structure built upon it must also be changed. Therefore, testing should not be isolated as an inspection activity. Rather testing should be involved throughout the SDLC in order to bring out a quality product.

The following testing activities should be performed during the phases:

Requirements Analysis

- Determine correctness
- Generate functional test data.

Design

- Determine correctness and consistency
- Generate structural and functional test data.


Programming/Construction

- Determine correctness and consistency
- Generate structural and functional test data
- Apply test data
- Refine test data

Operation and Maintenance

- Retest

Difference between Quality Assurance, Quality Control, and Testing?

Many people and organizations are confused about the difference between quality assurance (QA), quality control (QC), and testing. They are closely related, but they are different concepts.

But all these three are useful to manage risks of developing and managing software.
Quality Assurance: A set of activities designed to ensure that the development and/or maintenance process is adequate to ensure a system will meet its objectives.
Quality Control: A set of activities designed to evaluate a developed work product.
Testing: The process of executing a system with the intent of finding defects. (Note that the "process of executing a system" includes test planning prior to the execution of the test cases.)
QA activities ensure that the process is defined and appropriate. Methodology and standards development are examples of QA activities. A QA review would focus on the process elements of a project - e.g., are requirements being defined at the proper level of detail.

QC activities focus on finding defects in specific deliverables - e.g., are the defined requirements the right requirements

Testing is one example of a QC activity, but there are others such as inspections

The difference is that QA is process oriented and QC is product oriented.

Testing therefore is product oriented and thus is in the QC domain. Testing for quality isn't assuring quality, it's controlling it.

Quality Assurance makes sure you are doing the right things, the right way.
Quality Control makes sure the results of what you've done are what you expected.

Tuesday, January 4, 2011

Software development life cycle


The Systems Development Life Cycle (SDLC), or Software Development Life Cycle in systems engineering and software engineering, is the process of creating or altering systems, and the models and methodologies that people use to develop these systems. The concept generally refers to computer or information systems.

In software engineering the SDLC concept underpins many kinds of software development methodologies. These methodologies form the framework for planning and controlling the creation of an information system: the software development process.

Software Testing Life Cycle


Software testing life cycle identifies what test activities to carry out and when (what is the best time) to accomplish those test activities. Even though testing differs between organizations, there is a testing life cycle.






Software Testing Life Cycle consists of six (generic) phases:

* Test Planning,
* Test Analysis,
* Test Design,
* Construction and verification,
* Testing Cycles,
* Final Testing and Implementation and
* Post Implementation.


Software testing has its own life cycle that intersects with every stage of the SDLC. The basic requirements in software testing life cycle is to control/deal with software testing – Manual, Automated and Performance.

Test Planning

This is the phase where Project Manager has to decide what things need to be tested, do I have the appropriate budget etc. Naturally proper planning at this stage would greatly reduce the risk of low quality software. This planning will be an ongoing process with no end point.

Activities at this stage would include preparation of high level test plan-(according to IEEE test plan template The Software Test Plan (STP) is designed to prescribe the scope, approach, resources, and schedule of all testing activities. The plan must identify the items to be tested, the features to be tested, the types of testing to be performed, the personnel responsible for testing, the resources and schedule required to complete testing, and the risks associated with the plan.). Almost all of the activities done during this stage are included in this software test plan and revolve around a test plan.

Test Analysis

Once test plan is made and decided upon, next step is to delve little more into the project and decide what types of testing should be carried out at different stages of SDLC, do we need or plan to automate, if yes then when the appropriate time to automate is, what type of specific documentation I need for testing.

Proper and regular meetings should be held between testing teams, project managers, development teams, Business Analysts to check the progress of things which will give a fair idea of the movement of the project and ensure the completeness of the test plan created in the planning phase, which will further help in enhancing the right testing strategy created earlier. We will start creating test case formats and test cases itself. In this stage we need to develop Functional validation matrix based on Business Requirements to ensure that all system requirements are covered by one or more test cases, identify which test cases to automate, begin review of documentation, i.e. Functional Design, Business Requirements, Product Specifications, Product Externals etc. We also have to define areas for Stress and Performance testing.

Test Design

Test plans and cases which were developed in the analysis phase are revised. Functional validation matrix is also revised and finalized. In this stage risk assessment criteria is developed. If you have thought of automation then you have to select which test cases to automate and begin writing scripts for them. Test data is prepared. Standards for unit testing and pass / fail criteria are defined here. Schedule for testing is revised (if necessary) & finalized and test environment is prepared.

Construction and verification

In this phase we have to complete all the test plans, test cases, complete the scripting of the automated test cases, Stress and Performance testing plans needs to be completed. We have to support the development team in their unit testing phase. And obviously bug reporting would be done as when the bugs are found. Integration tests are performed and errors (if any) are reported.

Testing Cycles

In this phase we have to complete testing cycles until test cases are executed without errors or a predefined condition is reached. Run test cases --> Report Bugs --> revise test cases (if needed) --> add new test cases (if needed) --> bug fixing --> retesting (test cycle 2, test cycle 3….).

Final Testing and Implementation

In this we have to execute remaining stress and performance test cases, documentation for testing is completed / updated, provide and complete different matrices for testing. Acceptance, load and recovery testing will also be conducted and the application needs to be verified under production conditions.

Post Implementation

In this phase, the testing process is evaluated and lessons learnt from that testing process are documented. Line of attack to prevent similar problems in future projects is identified. Create plans to improve the processes. The recording of new errors and enhancements is an ongoing process. Cleaning up of test environment is done and test machines are restored to base lines in this stage
***